New Construction Electrical
New Construction Electrical
Planning and Design
Electricians review blueprints to map out circuits, calculate power loads, and plan outlet or switch locations.
Rough-In Phase
Cables, conduits, and junction boxes are installed through open studs and ceiling joists before drywall or insulation goes in.
Panel Installation
The main circuit breaker panel is set up and wired to distribute power safely throughout the structure.
Trim-Out Phase
Switches, wall plates, light fixtures, and appliances are connected after the walls are finished
Testing and Inspection
The entire system is tested for proper voltage and grounding to meet local building codes
We complete installation of wiring, panels, and devices in a brand-new building or major addition before the walls and ceilings are closed up meet current safety codes